Installed most everything in the engine bay. New radiator, transmission oil cooler, AC compressor, AC plumbing, DC wiring etc.
Then the new radiator started weeping at the heater hose connection. So out it came and back to the radiator shop. They fixed it and so far so good.
Installed the custom console, wired all that up. Aux right hand fuel tank gauge, aux fuel pump to transfer fuel from the right side to left side tank.
Master relay, 12 slot fuse holder, voltmeter, USB port, DC power ports, heated seat switches and mobile repeater relay switch. Two-way radio, remote control head and speaker. Dash board, AC duct work, instrument cluster, bezel and some trim.
Last night, flush mounted two overhead LED lights that will be wired to come on with the interior light switch and both door switches.
Hopefully, we will be able to install the doors and the hood after completing a few more of the other modifications.
Then, we start the box modifications, ugh more work.
To be continued.....